The v0.1 milestone has a precise statement (foundational document §10):
A developer takes a feature from idea to code entirely in the terminal, with reviewable specs, using two agents from different vendors in parallel.
This document is the acceptance script: the last verification before calling something v0.1. It has two runs — an automated one (in CI, with simulated agents and no network) and a manual one (the maintainer, with real agents) — and both must pass for the milestone to be accepted.
Resumen en español al final.
Acceptance criteria
Section titled “Acceptance criteria”Each step has an observable criterion:
| # | Step | Criterion | Automated coverage |
|---|---|---|---|
| C1 | propose |
a change is scaffolded under .meltemi/ and delegated to an agent |
e2e_hito::the_milestone_cycle_reaches_implemented_verified_archived |
| C2 | review |
the change’s deltas are presented as a checklist; a comment reworks and reopens | e2e_hito (checklist) · e2e_review (rework by comment) |
| C3 | implement (parallel) |
two distinct-profile agents work in separate worktrees from a common base; commits keep per-task traceability | e2e_hito::two_distinct_profiles_work_in_parallel_worktrees_with_traceability |
| C4 | verify |
every scenario is linked to a test or manually verified | e2e_hito (verify complete) |
| C5 | archive |
the delta folds into the living truth atomically; the change is preserved dated | e2e_hito (archived, living updated) |
| C6 | budgets | the TUI binary is under 25 MB and startup is within budget | release pipeline gate (release.yml) |
Automated run (CI)
Section titled “Automated run (CI)”The automated acceptance run is the e2e suite, executed by
cargo test --workspace on the three platforms (the release pipeline runs it as
a hard gate). It drives the full cycle over a fixture through the product’s own
methods, with two mock-agent profiles (--profile fast / --profile thorough)
standing in for two vendors — no network, no real agents (constitution).
Regenerating the verdict from the same commit produces the same result: the suite is deterministic (no wall-clock or randomness in the daemon paths under test).
Manual run (maintainer, real agents)
Section titled “Manual run (maintainer, real agents)”The maintainer performs the equivalent script once with two real agents from different vendors, and records the result in the acceptance report:
- In a scratch repository, configure two agents (each its own official binary, its own auth — fair play).
meltemi propose "<a real feature idea>"and review the scaffolded proposal.meltemi review <change>— comment on at least one requirement to force a rework, then approve once addressed.meltemi implement <change> <agent-A>and, on a shared task, race<agent-B>via a second worktree (meltemi assign <change> <task> A,B); confirm both work in isolation and commit with traceability.meltemi verify <change>— every scenario linked or manually verified.meltemi archive <change>— the delta folds into.meltemi/specs/.
Acceptance report
Section titled “Acceptance report”The manual run with real agents is published:
2026-09-26 — Claude Code 2.1.280 and OpenCode 1.18.32.
All six criteria pass; the report states five deviations, two of them product
defects with their own change. It was run after v0.1.0 was published, which
the report does not hide.
The milestone’s manual run became a guide anyone can follow from a published release: the one-developer test, whose report a tested release links from its notes.
The report records, per criterion (C1–C6):
- the result (pass/fail) of the automated run (the CI job and commit SHA);
- the result of the manual run (date, the two agents used, per-step outcome);
- the measured budget values against their §12 budgets;
- any deviations.
Template:
# Meltemi v0.1 acceptance reportCommit: <sha> Date: <YYYY-MM-DD>Automated run (CI): <job url> — C1..C5 pass, C6 budgets: TUI <size> / 25 MBManual run: agents <A>, <B> C1 propose ....... pass/fail (notes) C2 review+rework . pass/fail C3 parallel ...... pass/fail C4 verify ........ pass/fail C5 archive ....... pass/fail C6 budgets ....... <values>Deviations: <none | ...>Verdict: <accepted | not yet>Summary (español)
Section titled “Summary (español)”El hito v0.1 es el escenario de aceptación (§10): una feature de idea a código en
terminal, con specs revisables, con dos agentes de proveedores distintos en
paralelo. Dos corridas: la automatizada (suite e2e en CI con dos perfiles de
mock-agent, sin red) y la manual del mantenedor con agentes reales; ambas deben
pasar. Los criterios C1–C6 (propose, review+reelaboración, implement paralelo,
verify, archive, presupuestos §12) tienen cobertura observable. El informe
acompaña al tag con veredicto por criterio y es reproducible desde el mismo
commit. La corrida manual con agentes reales está publicada en
qa/2026-09-26-hito-v01-aceptacion.md:
los seis criterios pasan, con cinco desviaciones declaradas.